Stacijas 28, Sigulda

Renovation of the multi-family building in Sigulda, Stacijas 28. House was put into operation in 1973, there are 42 apartments with total useful area 2656.00 m2.

Energy Audit and Technical Survey proved that the overall technical condition of the building is unsatisfactory, as well as the building exterior wall, attic floor and basement ceiling thermal resistance does not meet the Latvian Building Code requirements.

To avoid the above mentioned problems and improve energy efficiency of the building, the following measures are being implemented within the project:

    1.Repairing of major walls and foundations.

    2.Insulation of building walls and hydroisolation of basement walls.

    3.Replacement of old wooden-frame windows.

    4. Replacement of main entrance and backyard doors.

    5. Repairing of the roof.

    6. Insulation of attic floor.

    7. Insulation of basement ceiling.

    8. Renovating of main entrance.

    9. Repairing of staircases.

    10. Renovation of heating system and restoration of pipe insulation in the basement;

    11. Renovation of ventilation system.

    12. Installation of energy monitoring system.

   

In result of energy efficiency measures energy consumption in the building is decreased for 52%.

In order to implement the project the Energy Performance Contract among RENESCO Ltd, housing manager and owners of apartments was concluded, providing energy efficiency measures in the building to be implemented, standards of comfort to be respected, as well as commitment of apartment owners and the managing body towards the ESCO company.

Total eligible costs of the project are EUR 320 594, from which part is financed by European Regional Development Fund.